Phase 4 track, Winter 2007 The push to complete the loop around the lake has begun! The track bed to the east and west of the lake was surveyed, excavated and shuttering placed in double-quick time. The concrete for the eastern side was poured and that for the western was delivered November 24. Barring unforeseen setbacks, all is on course for the completion of the track in time for the Royal Bath & West Show, 2008! The Bow-string bridge, which will be the final link in the lakeside circuit has its own page. If you click on a thumbnail, a larger picture will appear in a separate window. |
|||
| Phase 4 | |||
|
|
|
||
|
3. The surveying druids read
the runes of their sophisticated patented leveling device.
|
4.
A fleet of barrows were deployed to deliver the concrete
along the line of track.
|
||
|
|
6.
The gang in action, using everything from
bits of wood to the very handy muck-truck, on loan from
Paul Helps
Landscaping.
|
||
|
7.
The last barrow-load! Beyond this point
the track curves to the left into the trees towards the cascade bridge.
|
|
||
|
|
|
||
The bow-string bridge is on the next page |
|||
![]()